ICAR pilot study is expected to start June 1, 2023

ICAR validation study is expected to start September 1, 2023

Today 5/31/2023 is T-4 business days until Go Live.

T has been reset to 6/12 for release to App store

Federal holiday 5/29/2023

Current build info. Make sure you are testing with the most recent build.

Check in your profile settings in the app to be sure.

Platform

Build

Access

MobileToolbox

iOS

1.5.0 (116)

Testflight

v1.5.6

Android

0.28.39 (40)

Internal test build 0.28.40

v1.5.7

Current study info

*The QA study may crash on some Android devices because the schedule is quite large to accommodate many repeatable sessions. I have set up a short QA study that can be used for Android testing.

Work item ID

Description

Status

Next steps

Who

DHP-926 - Getting issue details... STATUS

After doing the practice puzzle, user is immediately shown the “Exit Activity” screen indicating that assessment is done

Triage - deprioritized

This is expected behavior to spec for the 2nd administration of a CAT engine measure. No changes required for pilot study.

NU to triage and prioritize this work according to researcher needs

DHP-923 - Getting issue details... STATUS

duplicate zip archives were being created on iOS

Resolved in iOS build 109

none

N/A

Receive and integrate new build from NU to resolve

  1. include $schema fix

  2. include array-->object fix

  3. include UX fixes

Resolved

Build is expected from NU by 9AM pacific on 5/19 or faster if possible. Cutoff day to receive final build is 5/23

Keith, Nate, Shannon

N/A

QA to check for completion, build integrity, raw .json arrival and structure in Synapse

In progress

ongoing generation and evaluation raw .json

Sage QA, NU QA, NU researchers

ETL-440 - Getting issue details... STATUS

Data is failing validation due to use of reserved keyword $schema within the taskdata

Resolved

none

DHP-936 - Getting issue details... STATUS

New Android validation errors. jsonschema property is not being included in metadata.json

Resolved

none

DHP-935 - Getting issue details... STATUS

New validation errors. jsonschema property is not being included in metadata.json

Resolved

none

DHP-937 - Getting issue details... STATUS

Assessments not being marked as completed in Android

Resolved - blocked

This issue to be addressed as part of a future overhaul of data upload

DHP-940 - Getting issue details... STATUS

Android assessment data is missing a required property

Resolved

DHP-938 - Getting issue details... STATUS

Study schedule is locked and metadata is not updateable for the study. Only known resolution is to create a new study and pipeline

Resolved

none

DHP-945 - Getting issue details... STATUS

Missing upload

Resolved - won’t fix

This is part of a larger architectural revamp of uploads that we will work through post-renewal. This state is NOT different than our current live clinical studies.

Shannon

DHP-946 - Getting issue details... STATUS

ambiguous encoding of userinteractions

QA

QA in iOS build 115

Keith

DHP-941 - Getting issue details... STATUS

Pause and ‘continue later’ restarts the 3DR activity from the beginning instead of last item

QA

addressed in build 114

Anyelo, Stephanie

ETL-426 - Getting issue details... STATUS

Continue development work on pipeline

Resolved

Pipeline is working, only need to update and merge to complete. Validate Android validation errors with 5/24 builds.

Phil

IBCSPRT-174

Onboard pilot study to pipeline

Resolved

https://sagebionetworks.jira.com/l/cp/jnuvVAAi

DHP-948 - Getting issue details... STATUS

Add permissions for the new study that was created to pick up metadata updates to the assessments

Resolved

none

DHP-933 - Getting issue details... STATUS

Setup permissions so scoring code can run on Pilot study

Resolved

none

Larsson should now be able to run scoring code when ready for QA study

DHP-934 - Getting issue details... STATUS

Setup permissions so scoring code can run on the short QA study for Android data

Resolved

none

Larsson should now be able to run scoring code when ready for QA study

N/A

Final scoring requirements

Resolved

none. confirmed .json--> parquet will use schema validation only

DHP-928 - Getting issue details... STATUS

Setup permissions so scoring code can run on ICAR QA study

Resolved

Test out as part of scoring code review

Larsson should now be able to run scoring code when ready for QA study

TBD

Update scoring code

In progress

Pending parquet availability

Larsson

IBCSPRT-174

Deploy pipeline for pilot study

Resolved

none

TBD

Parquet and scores UAT

In progress

Parquet is available for both iOS and Android.

Aaron, Hugh, Larsson

DHP-927 - Getting issue details... STATUS

Exit activity on measures does not exit if user is delayed. iOS only

Resolved - unable to reproduce

New testflight build 111 was unable to reproduce issue. Resolving and will monitor for future.

Open questions

Put it here, please don’t leave it in email and assume it is being tracked.

Question

Who is asking

Answer

Answered by