ICAR pilot study is expected to start June 1, 2023
ICAR validation study is expected to start September 1, 2023
Today 5/31/2023 is T-4 business days until Go Live.
T has been reset to 6/12 for release to App store
Federal holiday 5/29/2023
Current build info. Make sure you are testing with the most recent build.
Check in your profile settings in the app to be sure.
Platform | Build | Access | MobileToolbox |
---|---|---|---|
iOS | 1.5.0 (115) | Testflight | v1.5.6 |
Android | 0.28.39 (39) | v1.5.7 |
Current study info
*The QA study may crash on some Android devices because the schedule is quite large to accommodate many repeatable sessions. I have set up a short QA study that can be used for Android testing.
Study | Study ID | SynID | Data access team |
---|---|---|---|
ICAR - QA Project Twei2 | mtbwrj | ||
ICAR short QA study | vwrdjf | ||
|
| ||
ICAR Pilot | gxvwhj | ||
ICAR Validation | TBD | TBD | TBD |
Work item ID | Description | Status | Next steps | Who |
---|---|---|---|---|
After doing the practice puzzle, user is immediately shown the “Exit Activity” screen indicating that assessment is done | Triage - deprioritized | This is expected behavior to spec for the 2nd administration of a CAT engine measure. No changes required for pilot study. | NU to triage and prioritize this work according to researcher needs | |
duplicate zip archives were being created on iOS | Resolved in iOS build 109 | none | ||
N/A | Receive and integrate new build from NU to resolve
| Resolved | Build is expected from NU by 9AM pacific on 5/19 or faster if possible. Cutoff day to receive final build is 5/23 | Keith, Nate, Shannon |
N/A | QA to check for completion, build integrity, raw .json arrival and structure in Synapse | In progress | ongoing generation and evaluation raw .json | Sage QA, NU QA, NU researchers |
Data is failing validation due to use of reserved keyword $schema within the taskdata | Resolved | none | ||
New Android validation errors. jsonschema property is not being included in metadata.json | Resolved | none | ||
New validation errors. jsonschema property is not being included in metadata.json | Resolved | none | ||
Assessments not being marked as completed in Android | Resolved - blocked | This issue to be addressed as part of a future overhaul of data upload | ||
Android assessment data is missing a required property | Resolved | |||
Study schedule is locked and metadata is not updateable for the study. Only known resolution is to create a new study and pipeline | Resolved | none | ||
Missing upload | Resolved - won’t fix | This is part of a larger architectural revamp of uploads that we will work through post-renewal. This state is NOT different than our current live clinical studies. | Shannon | |
ambiguous encoding of userinteractions | QA | QA in iOS build 115 | Keith | |
Pause and ‘continue later’ restarts the 3DR activity from the beginning instead of last item | QA | addressed in build 114 | Anyelo, Stephanie | |
Continue development work on pipeline | Resolved | Pipeline is working, only need to update and merge to complete. Validate Android validation errors with 5/24 builds. | Phil | |
IBCSPRT-174 | Resolved | |||
Add permissions for the new study that was created to pick up metadata updates to the assessments | Resolved | none | ||
Setup permissions so scoring code can run on Pilot study | Resolved | none | Larsson should now be able to run scoring code when ready for QA study | |
Setup permissions so scoring code can run on the short QA study for Android data | Resolved | none | Larsson should now be able to run scoring code when ready for QA study | |
N/A | Resolved | none. confirmed .json--> parquet will use schema validation only | ||
Setup permissions so scoring code can run on ICAR QA study | Resolved | Test out as part of scoring code review | Larsson should now be able to run scoring code when ready for QA study | |
TBD | Update scoring code | In progress | Pending parquet availability | Larsson |
IBCSPRT-174 | Deploy pipeline for pilot study | Resolved | none | |
TBD | Parquet and scores UAT | In progress | Parquet is available for both iOS and Android. | Aaron, Hugh, Larsson |
Exit activity on measures does not exit if user is delayed. iOS only | Resolved - unable to reproduce | New testflight build 111 was unable to reproduce issue. Resolving and will monitor for future. |
Open questions
Put it here, please don’t leave it in email and assume it is being tracked.
Question | Who is asking | Answer | Answered by |
---|---|---|---|
0 Comments