Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Table of Contents
class
maxLevel3
minLevel1maxLevel3
include
outlinefalse
indent
exclude
typelist
printablefalse
class

This document contains instruction for both study administrators and Bridge Downstream developers. Once the study administrator has requested that a new study be set up and alerted the developers to the first batch of data exported to Synapse, the developers will execute the steps described here to ensure that data is flowing smoothly from Bridge and through the pipeline.

Prerequisites

Bridge must have already created the study project. Documentation on how to create a new study project in Synapse from Bridge is here: https://sagebionetworks.jira.com/l/cp/T5EPF30w.

It is not necessary for data to have already been exported by Bridge to the study project, except for the “Initiate data processing” step in both the Study Administrator and Bridge Downstream Developers sections below.

Study Administrators

Request Synapse study set up

...

Once the /wiki/spaces/BD/pages/2746613791 completes, the /wiki/spaces/BD/pages/2749759500 can be manually run. This is a good opportunity to verify :

  • Verify that workflows and jobs are completing successfully

...

...

  • .

  • Ensure that the resulting parquet datasets can be read using pyarrow and that all data from the study project is represented.

Once a full run through the pipeline is complete, study data will be automatically processed on a recurring schedule as specified in the crontab in the previous step.

...