Question | Answer | Next steps |
---|---|---|
When will Shannon get a release candidate of the framework with this measure? | MobileToolbox 1.6.0 for iOS has been released as a swift source package: https://github.com/MobileToolbox/MobileToolbox/releases/tag/1.6.0 |
TestFlight version was rolled back to v1.5.0 Build 116 so no additional features will be included. |
What are the icons, colors, labels, etc. needed to add this as a shared assessment? |
|
|
Why are they aggregating the result file rather than adding multiple files (one for each sub-assessment) with a schema for validating that assessment? | ||
Is NU aware that their study launch date of Mid-July is put at risk by QA of their assessment (and framework) because of work we had put off doing to limit the QA for the ICAR measures? | With the focus on a speedy ICAR release, we held features back from the standard release cadence. This MCM study would run with the same known production state that we already have in our live studies – ie without the planned improvements unless we coordinate the release cadence timeline and build. Additionally, it means that current live studies would also not have the planned improvements | Weigh the pros and cons to build the release timeline Discussion results in returning to normal cadence to have the correct build information for both NU and Sage features and bug fixes. Release notes will be drafted during this window to begin on June 28, 2023 |
There are already two identifiers in the v1.5.0, build 117 app. MyCogMobileV1 MyCogMobileShortV1 Why are they changing the identifier? | The assessment identifier should be “MyCogMobileV1” | |
What changes to the frameworks (other than the task identifier) are planned between now (June 13) and study launch in mid-July? | Today’s 1.6.0 release incorporates all of the known feedback from the scientific owners. There’s nothing else planned and of course we don’t yet know about anything unplanned | |
Why aren’t they using the shared app code (v1.5.0) to release a version of the app where they can control the release cycle? | See first question answered with next steps. We will use v1.5.0.116 for MCM release | |
What is the total number of estimated participants and duration of the study | End goal is identification of correct battery as one long study or multiple assessments is more productive. | |
...